- PRODUCT CENTER -

Steel Structure in General Power Plant
Steel Structures in Coal-Fired Power Plants: Key Roles & Applications
Steel structures are indispensable in modern coal-fired power plants due to their high strength, rapid construction, and adaptability to large spans and heavy loads. They serve as the "skeleton" of the plant, ensuring stability, durability, and operational efficiency.
+86 17305413116
+86 17305413116
jack@xingyasteel.com
Contact Us

Product Parameters

steel power plant.jpg

Steel Structures in Coal-Fired Power Plants: Key Roles & Applications

Steel structures are indispensable in modern coal-fired power plants due to their high strength, rapid construction, and adaptability to large spans and heavy loads. They serve as the "skeleton" of the plant, ensuring stability, durability, and operational efficiency.


1. Primary Load-Bearing Structures

A. Main Powerhouse (Turbine Hall & Boiler House)

  • Function:

    • Supports heavy equipment (e.g., turbines, boilers) with column-free spans of 30–50m (using Q345B steel).

    • Reduces foundation load by 20–30% compared to concrete.

  • Advantages:

    • Faster construction (modular assembly cuts工期 by 30%).

    • Better seismic performance (ductile steel frames absorb vibrations).

B. Boiler Support Structures

  • Material: Fire-resistant steel (e.g., SM490FR) or coatings (intumescent paint) to withstand >500°C near boilers.

  • Design: Rigid frames resist dynamic loads from coal combustion.


2. Specialized Components

A. Chimneys & Flue Gas Ducts

  • Steel Inner Liners:

    • Titanium-clad steel or fiberglass-reinforced steel resists sulfuric acid corrosion (from SO₂).

    • Modular installation reduces construction time by 50%.

B. Coal Conveyor Bridges

  • Long-span trusses (60–100m):

    • Enclosed steel design prevents coal dust explosions.

    • Weathering steel (Q355NH) minimizes maintenance.


3. Auxiliary Facilities

  • Steel Platforms & Walkways:

    • Grating floors (anti-slip, corrosion-resistant) for safe maintenance access.

  • Coal Storage Domes:

    • Large-span space frames (120m+) eliminate interior columns.


4. Steel vs. Concrete: Critical Advantages

FactorSteel StructuresConcrete Structures
Construction Time6–12 months (prefabricated)12–24 months (curing required)
Space EfficiencyWider spans, flexible layoutsLimited by bulky columns
RetrofittingEasy modifications (welding/cutting)Difficult demolition
Sustainability90% recyclableHigh waste generation

5. Challenges & Solutions

  • High TemperaturesInsulation panels or water-cooled walls.

  • CorrosionHot-dip galvanizing (coastal plants) or aluminum-magnesium coatings.

  • Vibration ControlRubber isolators under turbine foundations.


6. Innovations & Trends

  • BIM & Modular Construction:

    • Pre-assembled steel modules (e.g., Shanghai Waigaoqiao Phase III plant) reduce on-site work.

  • Advanced Materials:

    • Q690 high-strength steel cuts weight by 15% while maintaining load capacity.

  • Smart Monitoring:

    • Embedded sensors track stress/fatigue in real-time.


Conclusion

Steel structures are the backbone of coal-fired power plants, offering unmatched speed, flexibility, and cost-effectiveness—especially for ultra-supercritical units. Future advancements in corrosion-resistant alloys and digital twin technologies will further solidify their dominance.


Steel gradeQ235, Q345B, Q355, S355JR
SurfaceHot DIP galvanized or painted
Connection methodSolder joints, bolts, rivets
Crane3t-30t
ProvisionPayment: T/T(30% prepaid as deposit, 70% balance before shipment)
Delivery time25-60 days
Supply capability2000Ton/day
DeliveryProtective packing, steel frame will be loaded in 40 ot or 40'gp, roof and wall panels and others will be loaded in 40'hq or 40'gp
Wall panel materialsVeneer, EPS color steel composite panel, PU color steel composite board, rock wool color steel composite panel, glass wool color
Steel composite panel, glass curtain wall
Window DoorSandwich doors, roll up doors, security doors, independent vertical windows, bar windows, independent windows


Packaging and Transportation

  • IMG_20241122_140133.jpg
  • IMG_20241122_164202.jpg

Instruments and Equipment

  • 2 (2).png
  • IMG_20241123_144755.jpg
  • IMG_20241122_094259.jpg
  • IMG_20241122_094231.jpg
  • IMG_20240814_120941.jpg

FAQ

Q: How can I get a quote for my project?

A: You can contact me anytime, via WeChat, WhatsApp, Email, or phone. I will get back to you as soon as possible.

jack@xingyasteel.com
+86 17305413116
+86 17305413116

Q: How long can I get the price?

A: If possible, please provide project CAD drawings, pictures or specific requirements. We usually quote within 6 hours. If you want to get a quote as soon as possible, please let us know via WeChat, WhatsApp or email so that we can prioritize your inquiry.

Q: Can we visit your factory?

A: Of course, we welcome you to visit our factory or production line on site to understand our strength and quality. We will arrange a professional team to serve you. You just need to send your itinerary and leave the rest to us.

Q: Do you provide customized product services?

A: Of course, our professional R&D team can design and produce the products you need according to your specifications and drawings. For example: special size, special control, OEM, etc.

Q: Where is the loading port?

A: Normally, we ship from Tianjin Port, Qingdao Port and Shanghai Port. Of course, we can also accept the port you specify.

Q: How to package the product?

A: According to the characteristics of the product and the mode of transportation, fix it in the most appropriate and stable way to ensure that there will be no bumps, corrosion, scratches and other problems during transportation.

Q: What if I have no import experience?

A: We have extensive export experience. Tell us what you need and we will take care of the rest! We will help you choose the most appropriate shipping service to get your products to where they need to be safely and accurately.

Q: Can you provide on-site installation service?

A: We can provide installation guidance service according to customer requirements. Construction drawings, installation drawings and videos will be sent to customers to help on-site installation. If necessary, our engineers will go to the site to guide the installation.

Q: How long is the delivery time?

A: It depends on the order quantity. Generally, the delivery time is about 10-20 days.

Q: What is your payment terms?

A: Payment ≤1000USD, 100% in advance. Payment ≥1000USD, 40% T/T in advance, the balance to be paid before shipment.

Q: How can I place an order if my trial order does not reach your MOQ?

Q: How can I place an order if my trial order does not reach your MOQ?
A: If your trial order is a small order, we can also provide the goods, we can communicate anything.

Q: How do you control product quality?

A:
1. Design quality: Consider possible problems in advance and provide high-quality design solutions.
2. Raw material quality: Select qualified raw materials
3. Production quality: Precision manufacturing process, experienced workers, strict quality inspection.

Contact Us

SUBMIT

RELATED PRODUCTS